ECUADOR LNG IMPORT TERMINAL

LNG terminal to receive and distribute LNG and Natural Gas to 400 MW Power Plant (C.C.)

ECUADOR LNG IMPORT TERMINAL

PHASE 1

Establish a receiving and distributing LNG terminal to the domestic demand (industrials)

LNG Import Terminal in Posorja Ecuador

  • Supply, install, operate and maintenance LNG-FSU of 120,000 m3 of LNG.
  • FSU is loading by LNG Carrier: 4 months.
  • Transport LNG by pipe from FSU to onshore.
  • Using LNG4speed STT (LNG transfer system, loading 4 lso-containers at the same time).
  • LNG storage facilities – Modular growing according to the market
Commissioning 2026-I

ECUADOR LNG IMPORT TERMINAL
ECUADOR LNG IMPORT TERMINAL

PHASE 2

Ecuador LNG – Import LNG Terminal (Phase 2)

Establish a receiving and distributing LNG terminal for natural gas supply to POWER demand (New Power Plant) + Transmission Line

LNG Import Terminal in Posorja Ecuador

  • Supply, install, operate and maintenance LNG-FSU of 120,000 m3 of LNG.
  • FSU is loading by LNG Carrier: 25 days.
  • Regas Unit Offshore: 360 m3 LNG/hr.
  • Transport Natural Gas by pipe from Regas-Unit to onshore.
  • New Power Plant: 400 MW (C.C.)
  • Transmission Line: 72 Km (230 Kv)

Commissioning 2027-III