ILO & PUERTO BRAVO LNG IMPORT TERMINAL

LNG terminal to receive and distribute Natural Gas to existing 2,000 MW Power Plants (S.C.).

ILO & PUERTO BRAVO LNG IMPORT TERMINAL

Establish a receiving and distributing LNG terminal for natural gas supply to existing Power Plants of 2,000 MW (Simple Cycle).

There is not existing gas pipeline infrastructure to supply natural gas. Nowadays these power plants are running with Diesel as a cold reserve.

ILO & PUERTO BRAVO LNG IMPORT TERMINAL
ILO & PUERTO BRAVO LNG IMPORT TERMINAL

Strategic power plants: decentralized power generation & located near to the demand (main mining projects in Peru & border w/Chile).

  • Gas-to-Power 1: 1,200 MW (Simple Cycle). Name of Power Plant: “Enersur – Ilo”. Owner: Engie (French Multinational utility company). Installed : 400 MW (2014 ) & 800MW (2016). Most efficient power plants in Peru. Dual Fuel: Diesel/Natural Gas
  • Gas-to-Power 2: 800 MW (Simple Cycle). Name of Power Plant: “Puerto Bravo” or “Samay”. Owner: I Squared Capital (Private Equity Firm Focusing on Global Infrastructure Investments). Installed : 800 MW (2016). Most efficient power plant in Peru. Dual Fuel: Diesel/Natural Gas.