Integrated Marine LNG Project with regional terminals
Integrated Marine LNG Project with regional terminals
Infrastructure facilities to deliver Natural Gas (NG) to LNG processing plant (FLNG) in Turkey, transport through LNG carrier to a receiving LNG terminal (FSU) and inject NG by pipeline to Romanian gas-pipeline network (interconnected to the EU’s gas pipelines).
NG pipeline from Ardahan to Hopa in Turkey; LNG processing plant in Hopa-Turkey; LNG Import Terminal in Constantza- Romania
Install, operate &maintenance a gas pipeline of 160 Km. Install, operate & maintenance a LNG processing plant (0.22 @ 1.0 MTPA), a LNG Carrier (15,000 m3) and a LNG Import Terminal (16,000 @ 130,000 m3).
The project is divided in Phase 1 and 2 dueto several factors: financial view(acceleration of cash-flow); operational view (flexibility) and; market view (LNG demand will growth gradually from small to large scale). Facilities of import terminal Phase 1 might move to another terminal. Hopa & Constantza will move to be relevant HUBs from Caspian Sea and Black Sea. Trans- Caspian Gas Pipeline can move forward.
Commissioning Phase 1: 2026-III and Phase 2: 2028 - III